Building System with CLT Hybrides – step 1

The hypothesis for the project is to create a construction system based on a combination of CLT (Cross-Laminated Timber) and Fibermatrix fiber boards and get a product that has better sound and heat insulation, weighs less, and uses less raw material in the production. The main method is to buy CLT and fiberboard and manufacture hybrid boards. The project will then test it on buildings and create a construction concept than can be presented to collaboration partners.

Participants

Atterfors Consulting AB and Frid och Hell’s Bygg AB.

Budget & time plan

The project’s total budget is 461 000 SEK and the project runs during eight months – between May and December 2022.